Remember that, for larger datasets and small inter-plane distances, the number of objects created can be potentially high, and if this is required, the operation of multiple splitting can take several minutes to complete, particularly if verification is also enabled. Datamine Studio Tutorial Verification Is Also You can choose to store the results of the Extract Separate operation in a single object.Ĭut and Fill Volumes Thankfully, Studio 3 provides a wealth of commands, such as Boolean operations as described in Chapter 5that allow you to create subsets of data by comparing two volumes. The wireframe triangle file does not have to be sorted by zone.Ĭlick again, inside the selected triangle to position the new point dynamically with the mouse e. Select a triangle on the wireframe data you wish to insert a point into. In the example shown on the left, both ZBASE and the lowest limit of the wireframe are the same, hence the identical figures. Where the shapes are similar this method can often produce the best link, particularly if tag strings are used judiciously. This tolerance is set in the Project Settings dialog File Settings. However, the underlying data of the generated object dataamine contain additional data in the GROUP column to represent which of the original wireframe object stduio triangle was derived from and in the SURFACE column to contain a number from that represented the extracted, separated surface to which the current data row i. If a string represents a two-dimensional outline then only the X and Y coordinates can be used.īy Filters could also be used as a selection method, providing Store Surface Number is selected. If attribute fields are specified, their values are taken from the first record in the wireframe triangle file for each zone, or from the first record in the file if no zone field is specified.Ī boundary string is created using the new-string command, and the string must be snapped to a point on the same string at each end.įor example, if a topographical surface model was captured from survey data at the start of a particular phase of mining operations, this model could be compared with, say, a similar survey, taken at a point in the future whereby the terrain has been progressively deformed.įull VR window documentation, including dedicated tutorials, can be found as part of your Studio 3 online Help. Datamine Studio Tutorial Verification Is Also.Datamine Studio Tutorial Manual Image Registration.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |